Title
FLETCHER JONES AIRPORT SHUTTLE FACILITY PARKING LOT (PA2023-0220)
Site Location: 20052 Birch Street
Recommendation
Summary:
A request for a conditional use permit (CUP) to convert a temporary parking lot into a permanent 39-space parking lot that will function as an extension of the adjacent airport shuttle facility operated by Fletcher Jones Motorcars. The lot will serve as overflow parking to shuttle customers, improve onsite circulation and it will include concrete pavement, a driveway approach, an access gate, striping, site walls, light fixtures, electric vehicle charging infrastructure, and landscape buffers. The parking lot will operate between the hours of 5 a.m. to 10 p.m., Monday through Saturday, and 6 a.m. to 10 p.m. on Sunday, consistent with the existing airport shuttle facility hours. Access to the parking lot will be limited to Fletcher Jones employees and it will not be open to the public. The existing CUP approved for the Fletcher Jones airport shuttle facility (PA2022-128) will not be affected by the project.
Recommended Actions:
1. Conduct a public hearing;
2. Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15311 under Class 11 (Accessory Structures) of the CEQA Guidelines, because it has no potential to have a significant effect on the environment, and the exceptions to this exemption under Section 15300.2 do not apply; and
3. Adopt Resolution No. PC2026-024 approving the Conditional Use Permit filed as PA2023-0220.