Legislation Details

File #: 26-3081    Version: 1
Status: Public Hearing
File created: 10/21/2026 In control: Hearing Officer
On agenda: 10/29/2026 Final action:
Title: Three-Year Construction Limit Extension (X2021-1337) Site Location: 1400 San Miguel Drive
Attachments: 1. Item No. 1 Staff Report, 2. 1a._Additional_Materials_Received_Hanna_X2021-1337

Title

Three-Year Construction Limit Extension (X2021-1337)

Site Location: 1400 San Miguel Drive

Recommendation

Project Summary

Add 499 square feet to the bedroom/bath/kitchen, add 543 square feet to garage, and remodel 2,130 square feet to existing single family dwelling.

 

First hearing was conducted on April 02, 2026.

 

Recommended Action

1.                     Conduct a public hearing;

2.                     Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 under Class 1 (Existing Facilities) of the CEQA Guidelines, because this project has no potential to have a significant effect on the environment;

3.                     The hearing officer may grant, or conditionally grant, up to a 180-calendar day extension, per application for extension, if the officer finds special circumstances warrant an extension of time, or the failure to meet the time limit was caused by circumstances beyond the property owner, applicant, or the contractor’s control. If the officer makes the findings to grant an extension, then the officer shall consider whether conditions are necessary to ensure the timely completion of the project in a manner that limits impacts to the surrounding property owners. The hearing officer shall deny the application if they cannot make the findings set forth in Newport Beach Municipal Code Section 15.02.095 (Addition of Sections 105.3.3,105.3.4, and 105.3.5).